Winder Building

Associated Services

  • Budgeting, from Inception Through Pre-Bid Document Development
  • Design Assist, for Conceptual Design Determination
  • Electrical Supply and Control of Complex Mechanical Equipment
  • Energy Monitoring and Metering Systems
  • Energy Saving Lighting and Control Systems
  • HVAC Controls

The project included the removal and installation of new fan coil units, light fixtures and power distribution throughout the entire building. All work was done under security presence, due to the secure nature of the building, and all work was performed on off hours (as the building was fully occupied during the entire project).